Standard ENElectrical Equipment and Systems Field Inspection, Testing, and Commissioning
Also Known As:
The PIP ELTFT01:2017 standard outlines the minimum requirements for conducting inspection, testing, and commissioning procedures for electrical equipment and systems post-installation. The standard establishes acceptable values for testing results and provides forms for recording inspection and test values. However, it should be noted that the testing of certain specialty equipment and packaged equipment that is application-specific is not covered by this standard.
In instances where specific inspections, tests, and commissioning require an independent testing organization or an equipment manufacturer's representative, this standard does not specify the need for such third parties or designate responsibility for coordinating with them. The responsibility for including and coordinating these third parties, if necessary, should be defined in the project scope.
While the standard does not encompass full compliance inspections mandated by codes and regulations, it does ensure equipment integrity and alignment with project-specific documents, thereby providing assurance of compliance with project requirements.
Language(s) | English |
File Size | 2.4 MB |